In December 2016 we replaced the block of four tennis courts. The courts were very old and worn. This was causing major drainage issues on the tennis courts.
By ripping up and removing the old surface, some base reconstruction and of course a fantastic new 19mm Pro tennis product made by Urban Turf Australia we fixed all problems.
When the soccer club approached us to quote this project we knew that the transformation would be spectacular.
Even we were blown away with what we achieved.
The space was so run down, muddy and covered in rubbish.
The base on the 800m2 futsal pitch came up amazing. A solid base is always the key to a successful field.
We added new...
Do you have a tennis court or space that you're not using to its full capacity?
The client of this job has 3 teenage boys who all play soccer. They weren't using the space so they decided to transform it. We pulled up the tennis court in a day, laid the new product in a day and on the last day sanded, rubbered and cleaned up.
...
The existing surface of this government facility had servere water pooling issues. The pitch had not been built with sufficient fall or proper drainage.
Our process involved:
Excavate and remove existing surface
Raise surface height with additional rock
Laser grade appropriate fall
Add aggi pipes and spoon drain
...
Mackellar's oval was dry and barren during the summer months, muddy and unusable during the wet months.
The transformation of the oval took 4 months and the process included:
Excavation and removal of soil
Crushed rock base laser graded
Crushed stone dust base laser graded
Concrete edging and spoon drains
...