Synthetic Soccer Pitch for Melbourne Government Facility

Written on the 30 May 2017

The existing surface of this government facility had servere water pooling issues. The pitch had not been built with sufficient fall or proper drainage.

Our process involved:

  1. Excavate and remove existing surface
  2. Raise surface height with additional rock
  3. Laser grade appropriate fall
  4. Add aggi pipes and spoon drain
  5. New fencing
  6. Concrete paths
  7. 40mm soccer product

By slightly reducing the size or the pitch we managed to utilise the space better for the staff. Making it easy to walk around and use.

  

 