Mackellar's oval was dry and barren during the summer months, muddy and unusable during the wet months.

The transformation of the oval took 4 months and the process included:

  • Excavation and removal of soil
  • Crushed rock base laser graded
  • Crushed stone dust base laser graded
  • Concrete edging and spoon drains
  • New goal posts
  • 40mm soccer pitch
  • 19mm running track

As you can see by the slideshow below, the transformation was a huge success and Principal Matt Borg could not be happier.

 